Sunday, September 5, 2010

An Update

Well the has been a little while since last update.  Once the bricks were done, things have been moving along quite nicely.  Don't know why Eden Brae do it the way they do, and they really need to look at getting more bricklayers on their books.

Anyway:

The last month has seen:

Brickwork completed.  This really made the house start looking like a house, not just a frame with tiles on it.





Air Conditioning Ducting Installed
Electrical Fitout Completed (I have some concerns about this and have raised it with my Site Supervisor already)
Some more Plumbing completed, including the Ensuite Cistern and Gas Meter.
Gyprock/Plasterboard (Ceilings and Walls) installed.

I think I will be at lockup at the end of next week from what the Site Supervisor is saying.  Really keen to see the corner stacker door in place.  I have a few concerns as there appears to be water inside the house and in the ceiling of the Portico, so not sure if there is some leaking somewhere.  Going to raise it with him tomorrow.

Till next time.